The Lazio Region and the European Investment Bank (EIB) have launched «Regione Lazio EU Blending II»: EUR 120 million of EIB funding at a conventional rate, allocated to three banking groups, plus EUR 15.55 million from the Region to cut the interest cost of SME loans. Applications for the grant are submitted on Lazio Innova’s GeCoWEB Plus platform from 12:00 on 23 November 2026. The mechanism in one sentence: first you get the loan from the bank, then you apply to the Region for the grant. Understanding this sequence avoids the most expensive mistakes.
A note on transparency: we rely on the official texts, namely regional decision no. G14836 of 27 October 2026 and the Public Notice published in the Lazio Region’s Official Bulletin (BUR) no. 87 of 29 October 2026, plus Lazio Innova’s summary sheet and dedicated pages. We have not yet read the application forms, the GeCoWEB Plus operating guide or the FAQs, which do not appear to be published yet. This article is general information and not financial or credit advice: the bank decides whether to grant the loan under its own rules, so for your specific case speak to your bank and your adviser.
1. How it works: two steps, two parties
The loan is granted by one of the banks allocated the EIB funding, on commercial terms and after the bank’s own creditworthiness assessment. The interest grant is awarded by the Lazio Region, through Lazio Innova, and only concerns loans that have already been disbursed. The EIB has set aside EUR 120 million for SMEs and mid-caps in Lazio as funding at a conventional rate, and the banks have committed to making available their own resources in an amount equal to what they received. The funding is split as follows:
| Bank or group | EIB funding |
|---|---|
| BNL | EUR 30 million |
| ICCREA Banca, BCC di Roma, BCC di Bellegra, Banca TEMA, BCC dei Colli Albani | EUR 45 million |
| Mediocredito Centrale, BdM Banca, Cassa di Risparmio di Orvieto, Banca Italiana per l’Ambiente e per l’Energia, Banca del Fucino | EUR 45 million |
Loans backed by EIB funding have these features:
- Amount: from EUR 100,000 to EUR 10 million.
- Term: from 2 to 12 years, with up to 24 months of pre-amortisation.
- Rate: fixed or variable, in any case lower than the rate the bank charges on loans funded with its own resources.
- Guarantees: allowed, including the Central Guarantee Fund for SMEs.
- Who can apply: SMEs and mid-caps (up to 3,000 employees) with an operating site in Lazio.
One detail matters: the grant does not assess the «merit» of the project. The Notice states that there is no evaluation of the operations, because economic and financial sustainability has already been checked by the bank when it granted the loan. In practice the real filter is the bank: without a disbursed loan, nothing starts.

2. How much the grant is worth
It is a non-repayable grant, awarded under the de minimis regime and paid in a single instalment. It is calculated as a percentage of the present value of the interest in the loan’s amortisation schedule, which the bank certifies on a dedicated form. The discount rate is the EU reference rate for Italy in force on the application date, plus 100 basis points. There are three percentages:
| Percentage | For which loans |
|---|---|
| 100% | Projects by SMEs in the automotive supply chain, with a certificate from the Consorzio Industriale del Lazio |
| 90% | Green projects certified by the bank according to EIB guidance, or an operating site in Assisted Areas or Industrial Crisis Areas |
| 80% | All other eligible loans |
An example, only to understand the logic. If the present value of the interest in your amortisation schedule were EUR 100,000, the grant would be EUR 80,000 in the base case, EUR 90,000 for a green project and EUR 100,000 for the automotive supply chain. The real present value depends on amount, term, rate and amortisation schedule, and it is calculated by the bank in its certificate. For automotive the Region talks about «zero-rate» loans: technically it means the grant covers 100% of the present value of the interest.
Limits to keep in mind. The grant is de minimis, so it cannot exceed EUR 300,000 over three years per «single undertaking», meaning the group of linked companies: Lazio Innova checks the ceiling on the National State Aid Register and reduces the amount if needed. It cannot be combined with other public support calculated on the interest due on the same loan. If the loan is disbursed in several tranches, each tranche counts as a separate loan, but a single application can cover all of them with the certificates for each.
3. Who can apply for the grant
The EIB loan is open to SMEs and mid-caps, but the grant is only for SMEs, mid-caps excluded. The main requirements set by the Notice:
- Loan already disbursed. On the application date the applicant must already have obtained, from one of the listed banks, a loan backed by the EIB funding of at least EUR 100,000. The Notice does not provide for applying for the grant «in advance» of the loan.
- SME with a site in Lazio. Companies registered in the Italian Business Register (or self-employed professionals with an active VAT number), with fewer than 250 employees and turnover up to EUR 50 million or a balance sheet total up to EUR 43 million. The operating site of the financed project must be in Lazio. For companies with linked or partner enterprises, the thresholds are calculated by consolidating data under the EU definition of SME.
- Compliance. A regular DURC (social security compliance certificate) and, where required, a valid catastrophe insurance policy (Law 213/2023, article 1, paragraphs 101-111); no insolvency or liquidation proceedings; none of the grounds for exclusion listed in Appendix 2 of the Notice.
- Eligible loans. Loans without a defined repayment schedule, such as overdrafts or self-liquidating credit lines for invoice discounting, are excluded. Loans that finance relocating the activity outside Lazio are not eligible.
The banks must comply with the EIB exclusions. Excluded activities include, for example, tobacco, gambling, arms and ammunition, coal- and oil-related activities in energy projects and high-risk projects; purely financial operations, consumer credit and the purchase of property to be sold or let to third parties are also outside the scope, with some exceptions. The full list is in Appendix 5 of the Notice and the bank checks case by case.
4. The highest percentage: green, assisted areas, automotive
Green projects (90%). Under the EIB agreement at least 15% of the loans must finance projects that fall within the green economy, according to the categories in Appendix 4 of the Notice: among them, renewable energy production (solar, wind, biomass and biogas with the related sustainability conditions, electric heat pumps), storage systems, energy efficiency of buildings and industrial plants, and the circular economy. The check is up to the bank, which relies on an EIB tool, the Green Eligibility Checker, and issues a certificate to the company. If the project does not come out as green from the tool but the bank reports it to the EIB, the award is suspended until the outcome, with the amount held in reserve in compliance with the chronological order.
Assisted Areas and Industrial Crisis Areas (90%). What counts are the municipalities listed in Appendix 1: for example in the provinces of Frosinone, Rieti and Viterbo, and in parts of the territory of Latina, Rome and other municipalities. If the company has several sites, the place where the investment is made is what matters. Lazio Innova’s website has a tool, with no legal value, to check whether a location falls within the Assisted Areas.
Automotive supply chain (100%). The funds are reserved for SMEs that are first- or second-tier suppliers earning at least 20% of their turnover in the last financial year from recognised automotive players or, for the second tier, from first-tier suppliers in specific NACE/ATECO codes. Membership of the supply chain must be certified by the Consorzio Industriale del Lazio, on the basis of reports signed by a statutory auditor.
Watch the paperwork. If the bank’s certificate does not state that the project is green, or the Consorzio certificate is missing for automotive, the higher percentage is not granted and the Notice rules out a request for supplementary documents: you cannot fix it afterwards. The right document must be ready before you submit.

5. The application on GeCoWEB Plus
The application is submitted only online on Lazio Innova’s GeCoWEB Plus platform, in two steps.
- Filling in the Form. Available online from 12:00 on 16 November 2026. You upload the attachments: the bank’s certificate of the loan disbursed (with the green project indication, if applicable), the declaration of being an SME, a copy of the catastrophe policy or a statement explaining why it is not required, the Consorzio certificate for automotive if you ask for the higher percentage, the AA9 notice for self-employed professionals and, if there are relevant family or in-law relationships, the conflict-of-interest declaration.
- Submitting the application. From 12:00 on 23 November 2026 until 17:00 on 3 October 2028, unless closed early because the funds are exhausted, as announced by a notice in the BUR. You download the file generated by the platform, the legal representative signs it with a digital signature, you upload it and press «Invia domanda» (Submit application). If the Form or the uploaded documents are changed after the download, the platform blocks the upload and the procedure must be repeated.
As soon as the application is submitted, the platform sends a confirmation certified email (PEC) with the application code, date and time: that PEC establishes compliance with the deadlines and the chronological order. The procedure is first come, first served: eligible applications are funded in order of submission, within the available funds, of which EUR 5.55 million is reserved for the automotive supply chain. 3 October 2028 is therefore a maximum limit: if the funds run out sooner, the window closes sooner. The applicant is responsible for a working PEC, digital signature and digital identities: failures not attributable to the platform remain at its own expense.

6. After submission: review, award and obligations
Lazio Innova checks deadlines, completeness and requirements. If a supplement is needed, the documents must be sent within 10 days; applications are always inadmissible if they are late, lack the bank’s certificate or have the Form boxes left blank. The award is decided by the Regional Directorate and published in the BUR, with the COR code issued after the check on the National State Aid Register. The company then digitally signs the Commitment Deed with its bank account IBAN: within 20 days of the award for grants under EUR 150,000, while from EUR 150,000 upwards anti-mafia information is also required. Payment is made within 80 days of sending the deed.
The obligations to remember: do not repay the loan early before 24 months have passed since disbursement; do not cease the subsidised activity within 3 years of the final payment of the grant; do not relocate outside Lazio; keep the documentation for 6 years from the final payment; allow inspections. In case of revocation the grant must be returned within 15 days, plus interest at the official reference rate plus 5 percentage points. The requirements must also be maintained: if anything changes after the application, Lazio Innova must be informed.
7. Five mistakes to avoid
- Applying for the grant before the loan. The application only covers loans already disbursed on the application date: the sequence is loan, bank certificate, application.
- Assuming the loan is «backed by EIB funding». Check with the bank before signing, because the same bank also offers loans funded with its own resources that do not qualify for the grant.
- Forgetting the «green» indication or the automotive certificate. Without them, no higher percentage and no later supplement.
- Changing the file after the download. The platform blocks the upload: make all corrections before downloading and signing.
- Neglecting the conditions after the grant. Early repayment within 24 months, ceasing the activity within 3 years or another aid on the same interest can lead to revocation or reduction of the grant.
8. What to do now
If you are considering an investment in Lazio to be financed with a loan, the first step is to talk to your bank, if it is among the assigned ones, to understand whether and on what terms it can disburse a loan backed by the EIB funding and whether your project can qualify as green. In the meantime it is worth preparing the documents that depend on you: DURC, catastrophe policy, the legal representative’s digital signature, an active PEC, and a check of the de minimis ceiling and the SME parameters. Those financing capital goods can also assess with their accountant how this measure fits with other tax incentives, such as the hyper-depreciation we covered here: each case has to be checked individually.
Do you have a project to finance and want to understand how to organise the bank, the grant and the documents without losing time? Book a free introductory call with FinGreenTech or write to us at info@fingreentech.com. For official information on the measure you can write to Lazio Innova at infobandi@lazioinnova.it or call the toll-free number 800 98 97 96.
Sources: Lazio Innova, page «Finanziamenti con provvista BEI e contributo in conto interessi» (in Italian); Public Notice, annex A to decision no. G14836 of 27 October 2026 (Lazio Region BUR no. 87, supplement no. 1, of 29 October 2026) (in Italian); Lazio Innova summary sheet of 28 October 2026 (in Italian).
Transparency note. This article was drafted with the support of artificial intelligence tools and reviewed by the FinGreenTech Team, which is editorially responsible for it.